Alternate traffic pattern at Patch gate Mar. 1

An alternate traffic pattern will be in effect for access to and from Patch Barracks from 2 – 8 p.m. on Mar. 1, 2022, due to construction work at the main Access Control Point (ACP).

During this time, inbound traffic will be re-routed to enter Patch through the K&K gate while outbound traffic will exit through the main gate.

Pedestrian access at the main gate is unaffected, but the Enhanced Security Pedestrian Gate (ESPG) adjacent to the K&K Gate will not be operational during this time.

Times may vary. Please follow posted signage and gate guard instructions, and drive safely.