
By USAG Stuttgart Public Affairs,
The Patch Main Gate will open tomorrow, Friday, Oct. 30 at 10 a.m. As planned, the temporary access control point known as the Swabian Gate will close Friday, Oct. 30 at noon (12 p.m.).
USAG Stuttgart intentionally scheduled this transition of gate operations to ensure a smooth morning commute.
For more information on the gate improvement projects at U.S. Army Garrison Stuttgart, please visit https://www.stuttgartcitizen.com/gateconstruction2026/, follow us on Facebook, and download the My Army Post App.
